Southwest entry of Clark Hall (formerly Clark A-Wing) including surrounding concrete sidewalk area closed

Dates: July 31 – August 3

This outage is to replace the sidewalk outside the entrance

Contact: Tony Flores (Facilities Management) 970-658-6578


Social Sciences Hall (formerly Clark C-Wing closed 5/22/2026 through 8/10/2026

This building closure is to install a new fire alarm system and conduct ceiling tile abatement related to the addition of this system.

Southeast entry of Social Sciences Hall (formerly Clark C-Wing) including surrounding concrete sidewalk area closed 5/18/2026 through 8/10/2026

The southeast entrance to Clark C-Wing will be closed, along with all the concrete paved area around this entrance. People from the Animal Sciences parking lot will not be able to access the Center Avenue Mall from this area.

This outage it to update the entrance to be ADA accessible. Select the map below to view the closure area.

The southeast entrance to Clark C-Wing will be closed, along with all the concrete paved area around this entrance. This means access from the Animal Sciences Parking lot will not be able to access the Center Avenue Mall from this area.

Social Sciences Hall (formerly Clark C-Wing closed 5/22/2026 through 8/10/2026

This building closure is to install a new fire alarm system and conduct ceiling tile abatement related to the addition of this system.

Clark Hall (formerly Clark A-Wing) closed until August 2026. Monfort Quad and west parking spaces in Animal Sciences Lot #455 closed until summer 2027. Ann Gill Hall (formerly Clark B-Wing) closed until summer 2027.

Social Sciences Hall (formerly Clark C-Wing) remains open during the Clark revitalization project except for intermittent closures.

Select the map below for the closure areas and pedestrian and bicycle detours. 


Modulars for the Departments of Sociology and History located south of parking lot #473 (Northeast of Canvas Stadium)

These are temporary modulars for these departments during the Clark renovation project. Access to these modulars will be off W. Pitkin Street. Select the map above for the modular location.


ADA-accessible spaces relocated in Animal Sciences Lot #455 to east side starting 12/18/2023

Approximately 14 ADA-accessible spaces will be relocated from the west side of the lot to the east side. Select the map above for these relocated spaces.