For more information about Clark project construction-related impacts, email CSU_feedback@colostate.edu

For general information about the Clark revitalization and improvements in Clark, visit the Clark Revitalization project website

The construction fencing will be moved to surround A and B Wings, without any access to B Wing until the renovation of Clark in complete.

External access to Clark B-Wing closed starting 5/13 through May 2027

The construction fence will be moved and no external access to B-Wing will be available on 5/13. See the large map above for the updated construction area around B-Wing.

 


Modulars for the Departments of Sociology and History  located south of parking lot #473 (Northeast of Canvas Stadium), starting weeks of May 20 and 27

These are temporary modulars for these departments during the Clark renovation project. Access to these modulars will be off W. Pitkin Street. See the map above the modular location.


 

Clark A-Wing, portions of Monfort Quad and west parking spaces in Animal Sciences Lot #455 closed 12/18/2023 until summer 2027

A-wing will be closed for renovations. B-Wing will remain open until late spring 2024. C-Wing remains open at this time. Portions of the Monfort Quad will also be closed.

The westmost parking spaces of Lot #455 will be closed during the Clark revitalization project. See the map above for the closure areas and pedestrian and bicycle detours. 


ADA-accessible spaces relocated in Animal Sciences Lot #455 to east side 12/18/2023

Approximately 14 ADA-accessible spaces will be relocated from the west side of the lot to the east side.  See the map above for these relocated spaces.

Other parking lots that often have open ADA-accessible parking spaces include Lots #425 (Morgan Library) and #310 (Engineering).

View the CSU interactive map of all ADA-accessible parking space


Bicycle racks relocated to other areas around center area of Campus for Clark construction 12/18/2023

Over 500 bicycle parking spaces  will be relocated as part of the Clark Phase 1 construction. Bicycle racks have been relocated to the following areas:

  • Southwest side of Clark
  • On University Avenue north of the Library parking lot
  • On Pitkin Street south of the Education building

See the map below for these relocated bicycle parking areas.

View the CSU interactive map of all bicycle parking locations.