Found 140 Results
Page 9 of 14

Capital Construction Project Management


 Capital Construction Project Management Capital construction projects over $2 million follow a structured process that moves from early planning and approvals through design, construction, and final occupancy. Capital Construction Project Managers guide projects through each phase, coordinating with campus stakeholders, design …

January 21, 2022


Contractor Resources


  Contractor Resources  Contractors and subcontractors working on CSU capital construction projects must follow university requirements for site access, parking, construction coordination, and project documentation. The resources below provide key information to help contractors prepare for and complete work on …


Sustainability & Energy Management


  Sustainability & Energy Management FM Sustainability & Energy Management oversees and initiates a wide variety of FM and campus-wide operational sustainability projects. This unit is focused on energy and water efficiency and conservation, renewable electricity projects, conducts the university …

March 11, 2024


Division 04 – Masonry


  Part IIi – technical Standards Division 04 – Masonry Requirements for masonry materials, detailing, moisture protection, mockups, installation, and workmanship for CSU construction projects. Revised – 2026.01.27 Quick Links Select a section below to navigate directly to its requirements. …

January 13, 2026


Division 03 – Concrete


  Part IIi – technical Standards Division 03 – Concrete Requirements for concrete materials, testing, placement, finishing, curing, sealing, and specialized concrete systems for CSU construction projects.  Revised – 2026.01.27 Quick Links Select a section below to navigate directly to …


Chapter 01 – General Project Information


Part II – Design Standards Chapter 01 – General Project Information General requirements for project administration, pre-work meetings, progress meetings, work schedules, University policies, and parking permits for CSU Facilities Management projects. Revised – 2025.12.23   Quick Links Select a …

December 23, 2025


Chapter 09 – Construction Testing and Code Compliance


  Part II – Design Standards Chapter 09 – Construction Testing and Code Compliance Requirements for testing agencies, geotechnical investigations, construction-material inspections, reporting, code review, regulatory compliance, and required project inspections for CSU construction projects. Revised – 2025.12.23   Quick …

January 12, 2026


Stormwater Management


  Stormwater Management Stormwater runoff can carry pollutants into CSU’s waterways, impacting rivers, creeks, and aquatic life. Through planning, infrastructure, and ongoing compliance efforts, CSU works to minimize stormwater pollution and protect local water resources.   How Stormwater Works at …

January 20, 2022


Floodplain Management


Floodplain Compliance CSU reduces flood risk through updated planning, flood mitigation projects, and review of construction that occurs in or near the floodplain. 100-Year Floodplain Maps These maps show modeled 100-year floodplain conditions for Colorado State University, including floodplain boundaries, …

January 21, 2022


Part I – Standards Revision Log


  Part I – general Standards Standards Revision Log This revision log documents updates, additions, and modifications to the Facilities Planning, Design and Construction Standards. Design professionals and campus stakeholders should review this page regularly to ensure they are working …

December 12, 2025


Page 9 of 14