Main Campus impacts from Clark construction


Main Campus Impacts from Clark Construction For more information about Clark project construction-related impacts, email CSU_feedback@colostate.eduFor general information about the Clark revitalization and improvements in Clark, visit the Clark Revitalization project websiteAnn Gill Hall (formerly Clark B-Wing) closed until summer …

November 2, 2023


Board of Governor Program Plans


  Board of Governors Program Plans This page provides access to Facilities Management program plans prepared for Board of Governors review. Use the documents below to view current planning materials and related project information.   Program Plan Documents Open the …

April 17, 2026


Division 32 – Exterior Improvements


  Part IIi – technical Standards Division 32 – Exterior Improvements Requirements for exterior improvements including paving and hardscape, site furnishings, bicycle facilities, irrigation, turf, landscaping, and restoration of site and landscape areas for CSU construction projects. Revised – 2026.01.27 …

January 22, 2026


Division 21 – Fire Suppression


  Part IIi – technical Standards Division 21 – Fire Suppression Requirements for fire suppression materials, piping, valves, sprinkler systems, dry-pipe systems, preaction systems, fire extinguishing systems, testing, identification, and installation for CSU construction projects. Revised – 2026.01.06 Housing and …

January 6, 2026


Division 14 – Conveying Equipment


  Part IIi – technical Standards Division 14 – Conveying Equipment Requirements for elevators, elevator controls and diagnostics, service keys, cab and safety features, hydraulic systems, maintenance and warranty, and wheelchair lifts for CSU construction projects. Revised – 2026.01.05 Please …

December 12, 2025


Division 13 – Special Construction


  Part IIi – technical Standards Division 13 – Special Construction Requirements for swimming pools, fountains, aquariums, tubs and pools, controlled environment rooms, walk-in freezers, and greenhouses for CSU construction projects. Revised – 2026.01.27 Please also refer to “Part IV …

January 15, 2026


Division 08 – Openings


  Part IIi – technical Standards Division 08 – Openings Requirements for doors, frames, windows, storefront systems, glazing, door hardware, and automatic door operators for CSU construction projects. Revised – 2025.12.23 Housing and Dining Facilities (HDS) has adopted amendments for …

December 23, 2025


Division 05 – Metals


  Part IIi – technical Standards Division 05 – Metals Requirements for architectural and structural metals, welding, steel framing, joists, decking, metal stud systems, and fixed ladders for CSU construction projects. Revised – 2026.01.27 Housing and Dining Facilities (HDS) has …

December 16, 2025


Division 02 – Existing Conditions


  Part IIi – technical Standards Division 02 – Existing Conditions Requirements for evaluating existing site and building conditions, identifying hazardous materials, and coordinating asbestos assessment and remediation for CSU projects. Revised – 2026.01.27   Quick Links Select a section …

January 12, 2026


Division 01 – General Requirements


  Part IIi – technical Standards Division 01 – General Requirements Requirements for project administration, coordination, submittals, quality assurance and control, temporary facilities, site protection, construction closeout, training, performance, and commissioning for CSU construction projects. Revised – 2026.01.27 Quick Links …


Page 6 of 14